PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilled where the duct bank is located at the Administration Bldg. (800x600).jpg Backfilling and compacting the underground Tele-Data at the Administration Bldg. (800x600).jpg Closing up Elev. 1,2,3 (4th Floor) Facing North-East (800x600).jpg Installing rebar mats at Stair -4 (4th Floor) Facing East (800x600).jpg Installing the shear wall panels at Elev. 1,2,3 (4th Floor) Facing North  (800x600).jpg Pouring concrete at Elev. 4-Stair -2 (4th Floor) Facing North (800x600).jpg
Previous pageNext page Backfilling and compacting the underground Tele-Data at the Administration Bldg. (800x600)
Backfilling and compacting the underground Tele-Data at the Administration Bldg. (800x600)